Year
2022
Client
Mumbai Metro Corporation
Category
Mobile App
Product Duration
3 - 4 Weeks
Mumbai Metro Line 3 (Aqua Line) serves millions. The existing digital infrastructure faced a 42% drop-off rate during peak-hour ticketing due to high payment latency and a confusing "exit-station-first" hierarchy. In a city where every second counts, a 30-second delay in generating a QR code creates a physical bottleneck at the turnstiles.
As the Lead Product Designer, I overhauled the information architecture to prioritize "Time to Ticket." I shifted the mental model from a linear booking process to a "One-Tap Repeat" system, anticipating commuter behavior through historical trip data and location-based triggers.
Zero-Friction Ticketing, Introduced a "Quick Book" feature that uses heatmaps to place the most-used routes within thumb-reach.
Adaptive UI, Developed a high-contrast interface and dark mode to solve for "sunlight glare" at outdoor station entrances, ensuring QR scanners work first-time, every time.
Systemic Consistency, Integrated NCMC card management and city-wide transit alerts into a single source of truth, reducing the need for third-party navigation apps.
35% Increase in DAU, Strategic redesign of the digital ticketing interface turned occasional users into daily digital commuters.
50% Latency Reduction, Restructured the journey planning flow, cutting the time from app-open to QR-generation by half.
20% Bounce Rate Drop, Improved navigation clarity for station facilities and real-time updates, leading to higher engagement with "last-mile" connectivity features.






